KPI target tracking

See how far you are from target without waiting for month end

The target sheet you update by hand every morning is calculated by Primsis from your transactions. For each branch and employee: target, achieved, remaining units, required per day and the period-end projection, on one screen.

  • Completed, On track, At risk and Behind statuses
  • Units required per day, per branch
  • Load targets in bulk from Excel

First 3 months free · no credit card required · monthly fee per branch, excl. VAT

Sample screen, values are fictional

The problem

If you learn the gap at month end, you are late

Seeing which branch is behind on which KPI mid-month means adding up a sheet by hand, and by then the days are gone.

  • Remaining units live in one cell and the required daily rate in another file; the two never meet.
  • A Branch Manager learns their own standing only by asking you.
  • A lagging KPI is noticed at month end, with no time left to react.

What it does

  • Target, achieved, remaining

    For each KPI, target, achieved, remaining units and achievement percentage are calculated per branch and per employee.

  • Required per day

    Remaining units divided by remaining days shows how many a day you need from today. KPIs beyond target are tracked separately.

  • Period-end projection

    The daily average so far projects how the period will end; deviation from plan is shown.

  • Status labels

    Completed, On track, At risk and Behind bring the branches that need help to the top.

  • Remaining KPI table

    A branch × KPI matrix shows what remains to target and the required daily rate, with the company total.

  • Employee targets

    Distribute a target from branch to staff; a sales representative sees their own target and result on their own screen.

How it works

  1. 1

    Enter the targets

    Type branch and employee targets in the table or load them from Excel.

  2. 2

    It updates as sales are entered

    Every transaction adds to its KPI’s achieved figure; no manual totals.

  3. 3

    See who is behind early

    Status, remaining units and the required daily rate let you step in mid-month.

Frequently asked questions

How is the required daily figure calculated?

Remaining units to target divided by the days left in the period, so you see how many must be done every day from today.

What is the period-end projection based on?

The daily average achieved so far is applied to the remaining days. If the sales pace changes, the projection changes with it.

Which package includes target tracking?

The Premium package, together with commission, entitlements, clawbacks and reconciliation. The Lite package opens only the income-expense ledger and the daily cash register.

How do I enter targets?

Targets can be typed in the table or loaded in bulk with the ready Excel template.

Does a Branch Manager see every branch?

No. A Branch Manager sees only their own branch; the Customer Admin sees all branches and a coordinator sees the branches assigned to them.

See it with your own data

Try it free for the first 3 months, or let us run Primsis with your own branch and transaction structure in a demo.

First 3 months free · no credit card required · monthly fee per branch, excl. VAT